Aliso St. Retaining Wall, 1935-1939

 File — Box: 8, Folder: 15
Scope and Contents

Correspondence, maps, blueprints. Correspondence between M. C. Blanchard, LAUPT Engineering Committee Chairman, A. J. Barclay, LAUPT Construction Engineer, W. H. Kirkbride, SP Chief Engineer, regarding design and construction of Aliso St. retaining wall. Also contains contract between City of Los Angeles and C. F. Robbins (contractor) for construction of retaining wall.

Dates: 1935-1939

Specifications, etc. Aliso St. Retaining Wall, 1937

 File — Box: 8, Folder: 16
Scope and Contents

Report Specifications for bidders for construction of Aliso St. retaining wall, submitted by LAUPT to the City of Los Angeles.

Dates: 1937

Vignes St Improvements, Instructions to Bidders (1937), 1937

 File — Box: 8, Folder: 17
Scope and Contents

Specifications for bidders.

"Instructions to bidders, proposal, affidavit, and bond for grading, paving and otherwise improving Vignes Street, between 130 feet north of Bauchet Street and Clara Street, Union Passenger Terminal Station, PWA project no. 4361, unit no. J-1 (AC 42367 1/2)," City of LA, typescript on printed forms (1937).

Dates: 1937

Vignes St Grade Separation, Specifications (1937), 1937

 File — Box: 8, Folder: 18
Scope and Contents

Specifications for bidders. "Specifications for the construction of a grade separation structure and appurtenant work in Vignes Street, between Alhambra Avenue and 130 feet north of Bauchet Street and appurtenant sewer and storm drain work as herein described, Union Passenger Terminal Station, PWA project no. 4361 - unit I, 1937 (AC-42367)," City of LA, typescript on printed forms (1937).

Dates: 1937

Vignes St Improvements, Specifications, n/a

 File — Box: 8, Folder: 19
Scope and Contents

Specifications for bidders. "Specifications for grading, paving and otherwise improving Vignes Street, between 130 feet north of Bauchet Street and Clara Street, Union Passenger Terminal Station, PWA project no. 4361, unit no. J-1 (AC 42367 1/2)," City of LA, typescript on printed forms (nd).

Dates: n/a

Vignes St Grade Separation, Instructions to Bidders (1937), 1937

 File — Box: 8, Folder: 20
Scope and Contents

Specifications for bidders. "Instructions to bidders, proposal, affidavit, and bond for the construction of a grade separation structure and appurtenant work in Vignes Street, between Alhambra Avenue and 130 feet north of Bauchet Street and appurtenant sewer and storm drain work as herein described, Union Passenger Terminal Station, PWA project no. 4361 - unit I, 1937 (AC-42367)," City of LA, typescript on printed forms (1937).

Dates: 1937

Grade Separations Near LAUPT (1934), 1934

 File — Box: 8, Folder: 21
Scope and Contents

Correspondence, maps. Correspondence between railroad engineers regarding rerouting of streets around LAUPT site. Includes cost estimates for various street relocation proposals. Also includes maps of plan of area around LAUPT.

Dates: 1934

Grade Separations Near LAUPT (1935), 1935

 File — Box: 8, Folder: 22
Scope and Contents

Correspondence, maps. Correspondence between railroad engineers regarding rerouting of streets around LAUPT site. Includes map of proposed Queirolo St. subway and extension of Vignes Street.

Dates: 1935

Grade Separations Near LAUPT (1936-1937), 1936-1937

 File — Box: 8, Folder: 23
Scope and Contents

Correspondence, blueprints, maps. Correspondence between railroad engineers regarding rerouting of streets around LAUPT site. Includes maps and blueprints of Queirolo St. subway, location and top of rail elevations, plan showing LAUPT retaining walls along Queirolo Street, grade separation, between Queirolo St. and Bauchet St.

Dates: 1936-1937

LA&SLRR Connection to LAUPT (1935-1936), 1935-1936

 File — Box: 8, Folder: 24
Scope and Contents Correspondence, site maps. Correspondence between UP engineers regarding construction of rail bridge across LA River. Includes correspondence from L. T. Jackson to H. C. Mann regarding City of Los Angeles contemplation of a river truck speedway in bed of river, cost estimates for bridge designs, correspondence from Lloyd Aldrich, City of Los Angeles City Engineer to L. T. Jackson regarding maximum flow of LA River and clearance required between bridge and calculated high water line. Also...