Skip to main content

Cost Estimates, Approach, LAUPT, Part 3 of 4 (1935), 1935

 File — Box: 9, Folder: 5

Scope and Contents

Correspondence, maps, cost estimates.

Cost estimates from railroads regarding track approaches to proposed LAUPT. Includes itemized cost estimates for variant approach track layouts and track weights, valuation estimates for private land required for LAUPT construction. Also includes maps showing proposed trackage.

Dates

  • Creation: 1935

Conditions Governing Access

COLLECTION STORED OFF-SITE. Advance notice required for access.

Extent

From the Collection: 22 Linear Feet (22 boxes)

Language of Materials

From the Collection: English

Repository Details

Part of the USC Libraries Special Collections Repository

Contact:
Doheny Memorial Library 206
3550 Trousdale Parkway
Los Angeles California 90089-0189 United States