Skip to main content

Macy Street Grade Separation, 1934

 File — Box: 8, Folder: 7

Scope and Contents

Blueprints, correspondence. Plans for Macy Street bridge, correspondence, primarily from office of M.C. Blanchard (LAUPT Chief Engineer), regarding design, size, and cost of project. Includes a number of blueprints for the project.

Dates

  • Creation: 1934

Conditions Governing Access

COLLECTION STORED OFF-SITE. Advance notice required for access.

Extent

From the Collection: 22 Linear Feet (22 boxes)

Language of Materials

From the Collection: English

Repository Details

Part of the USC Libraries Special Collections Repository

Contact:
Doheny Memorial Library 206
3550 Trousdale Parkway
Los Angeles California 90089-0189 United States